Quick Answer

If your NYC home is an individual landmark or sits in a historic district, LPC approval comes before any DOB permit. There are three permit types: a Certificate of No Effect (CNE) and Permit for Minor Work (PMW), both approved by staff (often ~10 business days), and a Certificate of Appropriateness (CofA), which needs a public hearing (~3 months). LPC review is free. Check status on the Discover NYC Landmarks map.

You measured the windows, picked a warm bronze finish, put down a deposit. Then a neighbor mentions your block is a historic district, and the replacement you ordered needs sign-off from an agency you'd never heard of. The order goes on hold. So does your contractor.

That's how most NYC owners meet the Landmarks Preservation Commission. Here's the reassuring part: the LPC approval process is less of a black box than it looks, and the NYC landmark preservation rules are all written down. The whole game is knowing which permit you need, and in what order to file it.

So let's walk it, from checking your status to walking out with a permit, including when a Certificate of Appropriateness is unavoidable and when it isn't.

What the LPC regulates

The LPC is the city agency that guards New York's architecturally and historically significant buildings. Carry one of these three designations and any change you make falls under its jurisdiction:

You don't need to own anything famous. If your building sits inside the district boundary, the rules land on you the same as everyone else on the block.

First, find out if you're landmarked

Before you spend a dollar on drawings, confirm your status. Three ways to check, cheapest first:

  1. Search your address on the Discover NYC Landmarks map. It shows individual landmarks and historic district boundaries, with designation reports attached.
  2. Look up your building in the DOB's information system. An "L" in the Landmark Status field means LPC approval is required; a "C" means the site is calendared (under review for designation).
  3. Want it in writing you can lean on? Request a free Landmark Status Letter straight from the LPC.

If none of these turns up a designation, the LPC isn't in your project. Head straight to the DOB.

The three LPC permit types

What trips LPC review is work that changes how a protected building looks, mostly what's visible from a public street: facades, windows, doors, stoops, ironwork, storefronts, roofs and rooftop additions you can spot from the sidewalk, rear or side additions. Gut your kitchen inside a private home and the LPC usually doesn't care, unless it's an interior landmark. Which of three permits you file comes down to how hard your work hits the protected features.

Permit Type What It Covers Public Hearing? Typical Timeline
Certificate of No Effect (CNE)Needs a DOB permit but leaves protected features alone (interior work, mechanicals, in-kind repairs)No — staff level~10 business days when complete
Permit for Minor Work (PMW)Exterior work with no DOB permit needed that restores or fits the building (repointing, in-kind window repair)No — staff level~10 business days when complete
Certificate of Appropriateness (CofA)Alters significant protected features or falls outside LPC's rules (additions, new windows, major facade changes)Yes — full Commission~3 months

One line to keep in your head: fit inside the LPC's published rules and staff can sign off. Step outside them, or touch something the designation specifically protects, and it becomes a Certificate of Appropriateness headed for a hearing.

Staff review vs. the full Commission

Most landmark work never lays eyes on a commissioner. About 95% of LPC permits clear at staff level, no hearing, through the agency's Portico portal. A staff preservationist reads your drawings against the rules and, if they fit, issues a CNE or PMW. A complete application often clears in about ten business days.

The Certificate of Appropriateness is the long road. Your item gets advertised in the City Record and sent to the local community board, then the full Commission hears it at a public meeting where neighbors get to weigh in. Budget one to two months just to land on the calendar; once your application is complete, the Commission has 90 business days to rule. In a hurry? The LPC runs expedited tracks, an expedited CNE or FasTrack, for tightly defined work.

Not sure which permit your project needs?

Tell Archie what you want to do and where. He'll flag landmark status and map out the approvals before you spend on drawings.

Plan your NYC project

LPC comes first, and it's free

Sequence is what people botch. If your building is designated, you file with the LPC before the DOB will touch your construction permit. Landmarks approval is the prerequisite; the DOB simply won't issue for landmark work until the LPC has signed off. Put that on the calendar now, not after your architect files and the clock is already running.

Here's the rare piece of good news: the LPC charges no filing fee for its permits. Review is free. You'll still pay your architect or expediter, and you'll still owe DOB fees downstream, but the landmark approval itself costs you nothing at the counter. That's practically unheard of in NYC construction, and it matters, because restoring a historic facade the right way is a big chunk of any brownstone restoration.

What happens if you skip it

Landmark work without LPC approval is illegal work, full stop. The Commission can write a violation, order you to stop, and make you reverse the change, which is to say rip out those new windows and put the originals back at your own expense. Fines pile on top.

And it resurfaces. Unpermitted landmark work stalls your DOB sign-off, muddies a future sale, and can turn a weekend job into a multi-year cleanup. Filing first looks slower on paper and runs far cheaper in real life.

If tracking all of this sounds like a second job, that's where an assistant pays for itself. CC Archie on the emails with your architect and he holds the approvals, dates, and open items in one place, so nothing slips through the gap between the LPC and the DOB.

FAQ: NYC Landmark Preservation

How do I find out if my property is landmarked or in a historic district?
Search your address on the LPC's Discover NYC Landmarks map. You can also check the DOB Buildings Information System, where an "L" in the Landmark Status field means the site needs LPC approval. For a definitive answer, request a free Landmark Status Letter from the LPC.
Does an LPC permit cost money?
The LPC does not charge a filing fee for its permits, so LPC review is free. You still pay for the DOB permits that follow, plus your architect or expediter, but the landmark approval itself carries no filing fee.
How long does a Certificate of Appropriateness take?
Plan on roughly three months. Items going to a public hearing usually wait one to two months to be calendared, and once your application is complete the Commission is required to rule within 90 business days. Staff-level permits (CNE, PMW) often clear in about 10 business days.
What happens if I do work on a landmark without LPC approval?
It's illegal work. The LPC can issue a violation, order construction to stop, require you to restore what was changed, and impose fines. Because LPC approval must precede DOB action, unpermitted landmark work also stalls your building permit and can surface at resale.

Renovating a landmarked NYC home?

Archie maps your landmark status, the right LPC permit, and the DOB steps that follow, so you file in the right order.

Start planning your NYC renovation or see the DOB guide